NDSA:Survey-related action teams and timeline: Difference between revisions
Kate.murray1 (talk | contribs) No edit summary |
Meg.phillips (talk | contribs) No edit summary |
||
Line 40: | Line 40: | ||
Kate Murray | Kate Murray | ||
Meg Phillips | |||
Line 46: | Line 48: | ||
Jimi Jones | Jimi Jones | ||
Meg Phillips |
Revision as of 14:40, 20 June 2012
NDSA Standards Group
iPres 2012 Poster
July 18 – August 17: Staffing survey goes out
Week of August 20: Close out survey, collate data, generate graphs
Week of September 4: 1st draft of text for poster (action team works off-line)
September 13: WebEx for 2nd draft for poster
Week of September 17: Polish up final draft of poster text, copy edit, finalize graphs/images
September 24-26: Poster is printed
September 27: Poster is done and ready to transport to iPres
October 1-5: iPres conference
If you would like to help with the survey and/or iPres poster, lease sign up for the following action teams by adding your name under the appropriate team:
Action team for collating data and preparing graphs
Jimi Jones
Kate Murray
Meg Phillips
Action team for drafting/editing text for the iPres poster
Jimi Jones
Meg Phillips